2024. PENERAPAN MANAJEMEN WAKTU PADA PROYEK DENGAN MENGGUNAKAN METODE CRITICAL PATH METHODE CPM STUDI KASUS : PROYEK PEKERJAAN PENGASPALAN JALAN AIR MADIDI TONDANO. Sustainable Construction (SUSCON). 2, 1 (Sep. 2024), 138 142.