[1]
Suryanita Ramba, Rifana S. S. I. Kawet and Shirly S. Lumeno 2024. PENERAPAN MANAJEMEN WAKTU PADA PROYEK DENGAN MENGGUNAKAN METODE CRITICAL PATH METHODE (CPM) STUDI KASUS : PROYEK PEKERJAAN PENGASPALAN JALAN AIR MADIDI - TONDANO. Sustainable Construction (SUSCON). 2, 1 (Sep. 2024), 138-142.