ANALISIS RISIKO RANTAI PASOK MATERIAL TERHADAP KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI: STUDI KASUS RSUD SAM RATURALANG TONDANO . (2024). Sustainable Construction (SUSCON), 2(3), 522 532. https://ejurnal.unima.ac.id/index.php/suscon/article/view/11567