“ANALISIS PERCEPATAN WAKTU PENYELESAIAN PROYEK DENGAN METODE TIME COST TRADE OFF: Studi kasus : Penggantian Jembatan Sosongian Jalan Trans Sulawesi Desa Tumpaan Dua Minahasa Selatan ” (2023) Sustainable Construction (SUSCON), 1(3), p. 220 227. Available at: https://ejurnal.unima.ac.id/index.php/suscon/article/view/8677 (Accessed: 29 December 2025).