“PENERAPAN MANAJEMEN WAKTU PADA PROYEK DENGAN MENGGUNAKAN METODE CRITICAL PATH METHODE CPM STUDI KASUS : PROYEK PEKERJAAN PENGASPALAN JALAN AIR MADIDI TONDANO” (2024) Sustainable Construction (SUSCON), 2(1), p. 138 142. Available at: https://ejurnal.unima.ac.id/index.php/suscon/article/view/10286 (Accessed: 29 December 2025).