“ANALISIS RISIKO RANTAI PASOK MATERIAL TERHADAP KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI: STUDI KASUS RSUD SAM RATURALANG TONDANO ” (2024) Sustainable Construction (SUSCON), 2(3), p. 522 532. Available at: https://ejurnal.unima.ac.id/index.php/suscon/article/view/11567 (Accessed: 29 December 2025).