Suryanita Ramba, Rifana S. S. I. Kawet and Shirly S. Lumeno (2024) “PENERAPAN MANAJEMEN WAKTU PADA PROYEK DENGAN MENGGUNAKAN METODE CRITICAL PATH METHODE (CPM) STUDI KASUS : PROYEK PEKERJAAN PENGASPALAN JALAN AIR MADIDI - TONDANO”, Sustainable Construction (SUSCON), 2(1), pp. 138-142. Available at: https://ejurnal.unima.ac.id/index.php/suscon/article/view/10286 (Accessed: 21November2024).