[1]
Suryanita Ramba, Rifana S. S. I. Kawet, and Shirly S. Lumeno, “PENERAPAN MANAJEMEN WAKTU PADA PROYEK DENGAN MENGGUNAKAN METODE CRITICAL PATH METHODE (CPM) STUDI KASUS : PROYEK PEKERJAAN PENGASPALAN JALAN AIR MADIDI - TONDANO”, suscon, vol. 2, no. 1, pp. 138-142, Sep. 2024.