“PENERAPAN MANAJEMEN WAKTU PADA PROYEK DENGAN MENGGUNAKAN METODE CRITICAL PATH METHODE CPM STUDI KASUS : PROYEK PEKERJAAN PENGASPALAN JALAN AIR MADIDI TONDANO”. Sustainable Construction (SUSCON) 2, no. 1 (September 22, 2024): 138 142. Accessed December 29, 2025. https://ejurnal.unima.ac.id/index.php/suscon/article/view/10286.